Optimized for Desktop First...
Try making your window wider or switching to desktop mode.
Try making your window wider or switching to desktop mode.
|
||||||||||||||||||||||||
|
Mute Karimar
GeoCorp. The Initiative. |
Ship: | Retriever ( Mining Barge ) |
---|---|
System: | C-C99Z (-0.3) / Fountain |
Closest: | C-C99Z III - Moon 18 (0.57au) |
Time: | 2023-01-04 03:18 |
Points: | 1 |
Damage: | 15,224 |
Ship+Fit: | 79,025,474.52 ISK |
Dropped: | 25,375,779.16 ISK |
Destroyed: | 65,633,515.36 ISK |
Total: | 91,009,294.52 ISK |
Item(s) Dropped / Destroyed
Item | Qty |
Value |
|
---|---|---|---|
Mercoxit Asteroid Mining Crystal Type A I | 1 | 586,000.00 | |
Mercoxit Asteroid Mining Crystal Type A I | 1 | 586,000.00 | |
Modulated Deep Core Strip Miner II | 2 | 9,945,312.50 | |
Medium Shield Extender II | 1 | 679,000.00 | |
Survey Scanner II | 1 | 895,900.00 | |
Mining Laser Upgrade II | 1 | 943,273.33 | |
Mining Laser Upgrade II | 2 | 1,886,546.66 | |
Medium Kinetic Shield Reinforcer I | 1 | 85,750.00 | |
Medium Mercoxit Mining Crystal Optimization I | 1 | 261,972.73 | |
Medium Thermal Shield Reinforcer I | 1 | 136,600.00 | |
Hammerhead II | 3 | 2,643,300.00 | |
Hammerhead II | 1 | 881,100.00 | |
Mercoxit Asteroid Mining Crystal Type A I | 1 | 586,000.00 | |
Mercoxit | 238 | 11,397,820.00 | |
Retriever | 1 |
59,494,719.30 |
Insurance Possible payouts
Type | Cost | Payout |
---|---|---|
None | 0.00 | 11,519,373.00 |
Basic | 1,439,922.00 | 14,399,217.00 |
Standard | 2,879,843.00 | 17,279,060.00 |
Bronze | 4,319,765.00 | 20,158,903.00 |
Silver | 5,759,687.00 | 23,038,746.00 |
Gold | 7,199,608.00 | 25,918,590.00 |
Platinum | 8,639,530.00 | 28,798,433.00 |